Dec 12, 2013

Week Three of the Great Kitchen Remodel

Well, week three has come and not much head way has been made.  We are kind of at a stand still waiting on some things.

My appliances have all arrived.
Stove and microwave have been installed.  Microwave is awesome.  All kinds of pre programmed settings for snacks and a kid's menu setting (chicken nuggets, hot dogs, French fries, frozen sandwich) as well as a snack setting (nachos, chicken wings, potato skins, cheese sticks).  My favorite is the soften/melt (for chocolate, butter, cream cheese) and the defrost.  Of course it has a popcorn (all though all the popcorn packages state to not use the preset timing), pizza, potato and veggie (love this for frozen veggies) sensor setting.  I am just glad to cook something...anything...in the kitchen once again.  I have the old microwave set up in the garage, but man is it cold out there.

Stove has been very disappointing. First of all, picked this particular model because it advertised a free griddle.  When it was delivered, no griddle, is a rebate you have to send in.  Personally, I think rebates should be illegal.  Way too much time to fill out the forms, give them all kinds of information then wait and hope that you actually get it.  I am waiting on one from Kitchen aid now.  Any way, back to the stove.  So then, after learning I have to send in a special form from Home Depot (would have been nice to have gotten it when I bought the unit instead of an extra trip to the store to find out why I didn't get it) we found out while installing the stove last night that the inside frame was damaged on both sides. 


Enough so that the door won't seal for the oven so keeping any type of even temperature is out of the question.  Also, the little storage drawer will not open correctly either so it totally useless.  I have taken the issue up with Home Depot store manager, who pretty much told me I was out of luck because I accepted it that way.  I explained that I questioned the delivery guy about the drawer not working, he just told me it was because it wasn't level.  Then I was told because it had been longer than 48 hours there wasn't much they could do.  I explained that we found it with the 48 hours, but that they were already closed.  He then took me to the appliance department to see if it could be repaired.  I didn't say anything, but really wanted to when the store manager asked me if the stove still worked properly.  He kind of changed his tune a bit when the appliance guy told him that since the door was unable to seal, because of the frame damage, the heat would escape and could possibly catch the cabinets on fire.  I had not thought of that, very scary thought.

Finally, after over an hour of discussion, Maytag is sending me a new unit to replace the broken one.  It will be here next week.  At least then I will be able to cook, although I have no place to prepare the food, no place to wash the dishes and no place to sit down and eat the food.

We also ran in to a little time delay regarding a problem with floor tile.  Had to redo and then redo again differently.  Just had to wait for it to all set up before walking or moving any appliances or cabinet bases on it.  So, that delayed our counter top measurement, which delayed the counter top.  However, maybe it was meant to be.  Here is why.

I have to have the faucet when they measure for the counter top. I had originally decided to go with a stainless steel faucet and sink.  Then I found this one, then found those cabinet knobs to match.  Then I found out that I could get a brown sink.  So...since we had to delay the measure appointment, I took it as a sign to go ahead and get the brown sink.  It cost a little bit more because the counter top people offered a free one with the installation.  When you look at the big picture, it really isn't that much more money considering what I have already spent.  So, now there is no way to have the new kitchen going by New Year's day, but soon after.

Now that the floor is fixed and the appliances are here, hubby can finish up the installation of the cabinets.  Was waiting for the stove and dishwasher to arrive so he could see how much room he would need.  Once the dishwasher gets put in place, the cabinet next to it that houses the refrigerator can then be moved in place and attached to the wall.  I am looking forward to all the cabinets being finally installed so that I can start loading the cabinets.
I spent the whole day yesterday just loading the pantry.  I have come down with a stupid chest cold on top of everything else.  As I loaded the new pantry, expiration dates were checked and any date passed or that will expire in the next month or so was discarded.  An inventory was made of all products on hand so that I can start menu planning again.  Plus, I also placed a couple of empty containers in the shelves for future use. I spent a small fortune in storage containers, guess I am turning anal in my old age because I wanted all the baskets to be white, all the plastic containers to have the same color lids.  Also, all the trays are the same color in each drawer, although not all the drawers are the same.  In the largest drawer, I have a mesh expandable organizer for cooking utensils.  In one drawer I put a bamboo expandable divider for all the silver ware.  The rest of the drawers have black containers to hold the rest of my cooking utensils, knives and snacks.

Now, today, I have to pick which drawer I want to designate for foil, plastic bags, wax paper and such.  Depends on how all the cookware goes, may place that stuff in a hall pantry.  Now starts the task of choosing what to keep and what to get rid of.  I still have plenty of cabinets, some deep drawers and such.  Once hubby gets the set of bottom cabinets attached to the wall tonight, I will be able to see how many pots and pans I will be able to store.  I have surfed the internet and found some great sites that suggest the essentials needed for a well stocked kitchen.  I mean really, I don't need 14 skillets, 5 sets of pots and pans, 6 glass baking dishes and so forth.  I really need to downsize a bit.  I not only have 30 years of married life collecting kitchen ware, my Pampered Chef items and I now have what is left of my mom's kitchen ware as well.  You see, that gives me about 4 sets of mixing bowls.  I don't really like my metal ones, but hubby likes to eat cereal out of them for some insane reason.  Then, once I get my kitchen all back together, I will be looking in to purchasing a glass front china hutch or curio cabinet to display some collectable glassware.  This would be so much easier if I wasn't a border line hoarder.

Well, enough of a break.  Off to see how many boxes I can empty out by loading the new cabinets.  Thanks for stopping by, come back soon to see how the great remodel is going.

Dec 9, 2013

MPM - 12/9 - 15 Week Two of Kitchen Remodel

Wow what a week.  Look back over the last few post to catch up with the new kitchen remodel.

Now, for Meal Plan Monday over at Organized Junkie.  I have to be honest, I have no menu plan for this week, here is why.  I don't have a kitchen at the moment.  I have tried to cook, really I have, even bought a fancy toaster over that is also a rotisserie cooker as well.  Still trying to decide if I am going to keep it though.  At any rate, the problem with cooking is not really the cooking part, it is the prep part and the fact that I would have to wash all the dishes in the bathtub which kills my back.  The sink will not be hooked up until after the counter tops are installed, which is about three more weeks at this point.  Which hits during the week of Christmas, so if they can't deliver by the 20th, they will have to wait until after the 30th. 

However, I do have the old microwave hooked up in the garage so can use it now, which does help. My new appliances are being delivered today.  Hubby promised to install the stove and microwave this evening.   Also, the new fridge as well, it will need to run a while before I start putting food in there.  Here are some photos of how we have progressed.
 There is actually a dining room table at the other end of these boxes.  It is loaded down with small appliances (can opener, coffee maker, toaster oven) absolutely no room for any prep work for a meal.
First, the cabinets all arrived.  All the boxes were stacked in my dining area.  What a mess trying to live around these boxes.  I am just thankful that it was only for the week.  Hubby was waiting for his days off.  I am so thankful for his willingness to be my labor and for him to have the skills to be my labor.  He has some installing of appliances, repair to floor tiles and paint touch up yet, but actually for the most part he is finished until the counter top is installed (installation was included in the price) which thankfully, Home Depot was having a sale on.
And, hubby decided to let me know how he felt about my taking a picture and the labor he is doing.

I would be more than happy to help, if I just knew what to do and how. AND...if he would let me.
Hubby was hard at work Saturday morning, putting doors back on.  Notice the space between the wall and the cabinets?  They listed it as a 3in. space, added in a filler piece.  This just shows that  they do not look at these computer generated design diagrams (the designers turn in a set for each customer's job) all that closely, because there is not 3 inches of space left so hubby is having to cut down the filler board.  There is one other wall that the same thing happened with.  Actually, the bottom set of cabinets I just told hubby to leave the filler out completely.  There is such a narrow amount of space left that we just moved the cabinets all the way to one end and just left a little space between the cabinet and the doorway.  The counter top will still come all the way to end so it won't be noticeable at all.
So, how many people does it take to work on a sink base?  Several when you find out your home's wall is bowed.  Actually, the man in the yellow is our next door neighbor, he is a construction contractor and kitchens and bathrooms are what he does for a living.  We were so very thankful that he gave up a little of his time and popped over to show hubby some pointers and help get through some rough spots.
My daughter's cat is checking it all out.  You would think that with two cats in the house there would be no mice.  Not so, we have one that the remodel forced to relocate, unfortunately it is in the wall of our bedroom and making it's presence known at all hours during the night and early morning.  I have no idea how we will be able to get rid of the thing.
Measuring to cut out the back of the cabinet for access to the plumbing and electrical outlets to install the sink, dishwasher, garbage disposal and water line for refrigerator.

I think it is coming along so nicely.  Now, today, I get to position the cabinet shelves where I want and can start loading the food in the new pantry and what ever I am locating in the upper cabinets as well.

I plan to go to Home Depot this afternoon and see if I can exchange the faucet I bought for a different that I think will look much nicer with the over all design.  I have to have the faucet here tomorrow when they measure for the counter tops, so if they don't have it in stock I will just keep the one I bought.  I even have decided on the knobs that I will be putting on the cabinets and have already purchased all the outlet plate covers as well.  Was very lucky there as I found some that totally match the wall color and the glass tile for the backsplash which all matches the counter top I ended up going with.

Check back in a few weeks for the finished kitchen. This is the old fridge, but I just love the new design of the kitchen.  You can check older postings for the before photos.  Yes, once we get the floor repaired, some paint touch ups, the lights put back, new appliances installed, the counter tops and back splash all installed.  NEW KITCHEN will be done.  I am hoping to christen the new kitchen with New Year's Day dinner.  Wish me luck.